phototop4.jpg

Do Business With Us

Doing Business with Us

Do Business with Us

The Water Authority does business with a host of suppliers, contractors, vendors, service-providers and consultants. We encourage participation by businesses small and large.  Learn more about doing business with the Water Authority...

Employment

employment

Work with Us

We offer competitive salaries and an outstanding benefits package that includes participation in the state’s renowned retirement system. Learn more

Home arrow Your Water Authority arrow Business arrow Construction Information arrow Water Shut-off and Turn-on Procedures
Water Shut-off and Turn-on Procedures PDF Print E-mail

 

  1. When new waterline tie-ins to the existing water system are required, an electronic request and a shutoff plan for the water shut-off or water turn-on shall be submitted to the Water Authority.  The online request form can be found on the Water Authority Web Page at the following address: 

    http://www.abcwua.org/content/view/471/746/

  2. The request for a water shut-off or turn-on for a main designated as a Distribution Line must be submitted at least seven (7) working days before the date of the actual shut-off or turn-on.  Request forms received after 8:00 a.m. will be logged in and scheduled on the following working day and the seven (7) working day requirement will commence.
  3. The request for a water shut-off or turn-on for a main designated as a Transmission Line, Master Plan Line, Collector, or Well Collector Line must be submitted at least fourteen (14) working days before the date of the actual shut-off or turn-on.  Requests received after 8:00 a.m. will be logged in and scheduled on the following working day and the fourteen (14) working day requirement will commence.
  4. The request for a water shut-off or turn-on for a San Juan Chama designated transmission line or any other water line in the vicinity of San Juan Chama lines will be required to follow the procedures stated in the Water Authority Administrative Instruction No. 9 and must be submitted at least thirty (30) working days before the date of the actual shut-off or turn-on.  Requests received after 8:00 a.m. will be logged in and scheduled on the following working day and the thirty (30) working day requirement will commence.  CONTRACTOR shall complete the electronic request form, the electronic Request Form for Work Affecting San Juan Chama Transmission Lines, and submit all required design documentation.

 

Please Note the Following:

  • The reason for the water shut-off or turn-on shall be detailed and descriptive.
  • Water shut-offs may have to be scheduled at night or on weekends to accommodate water customers and traffic flow.
  • A map with street names, valve numbers, and pipe size will have to be submitted and attached to the request.  The following maps may be used for information and to produce maps needed for the request:

    - WATERMAPS  
     
  • Water shutoffs involving Transmission, Master Plan, Collector, Well Collector, or San Juan Chama lines may not be permitted during the months of May through September due to the demand on the system.  Construction schedules will need to be coordinated with the Water Authority, Plant & Field Divisions when these types of waterlines are impacted.  All subsurface work around San Juan Chama transmission lines require special procedures outlined in the Water Authority Administrative Instruction No. 9.
  • If the water shut-off or turn-on cannot be done on the requested date, the Field Supervisor will notify the CONTRACTOR as soon as possible.  The Water Authority shall have the authority to cancel scheduled water shut-offs if the Field Supervisor determines that:      
  1. CONTRACTOR is not ready to start work and completion of the work will extend beyond the requested time;
  2. CONTRACTOR is lacking the necessary equipment, parts, or materials on the job site;
  3. Any existing condition giving just cause to show that the scheduled water shut-off will extend beyond the requested time.
  4. Field operating conditions have changed which may impact the number of customers or fire hydrants in the shut-off or turn-on request.  

 

Questions or Comments:

Tim Cynova, P.E.

Chief Engineer

Field Division

ABCWUA

505-857-8296

This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

 

 

Last Updated ( Monday, 28 June 2010 )
 

Employees | Disclaimer | Contact Us & Feedback
Albuquerque Bernalillo County Water Utility Authority
P.O. Box 1293, Albuquerque, NM 87103
Phone: (505) 768-2500 | Fax: (505) 768-2580 | Email: wainfo@abcwua.org

Albuquerque Bernalillo County Water Authority